Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to remove all the construction equipment and the rolloff dumpster that’s in the front door. | |
| 02/19/2025 | ENGR Engineering Final | Passed |