Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/17/2026 |
ENGR Engineering Final
|
|
Not Ready |
Water harvesting area #1 should be widened creating at least a couple feet of flat bottom without making South slope too steep for DG slope protection. East of water valve make it deeper and more substantial per plan. Otherwise it looks good. When complete with site bldg will be ready. |
| 04/21/2026 |
ENGR Engineering Final
|
|
Passed |
|