Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2024 | ENGR Engineering Final | Partial Pass | Contractor did not install filter fabric under the rip rap. | |
| 10/03/2024 | ENGR Engineering Final | Passed |