Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2023 | COT - LCBU - Framing | Passed | Inspection for GLB and two wood column post per plan. 12/19/2023 |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2023 | COT - LCBU - Framing | Passed | Inspection for GLB and two wood column post per plan. 12/19/2023 |