Inspection Status: Partial Pass
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 06/18/2025 |
COT - LCPL - Plumbing Intermediate |
|
Partial Pass |
Partial pass for added floor sink off of 3" sewer, ok to proceed to next section |
| 06/27/2025 |
COT - LCPL - Plumbing Intermediate |
|
Passed |
Two floor drains two floor sinks end of the line clean out 3” 4 inch clean out tiled into vents 3” tie in for dishwashing machine 3 tie in to existing line coming from south portion of kitchen. Okay to backfill progress areas. Shading is required. 6/27/2025 |