Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/28/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Partial pass, all unfinished areas must be completed with either a DG type of material, Grass or Hydro seed. This includes all areas in the fenced in playground areas with the covered tables and benches. |