Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 07/24/2026 |
COT - HCBU - Framing |
|
Partial Pass |
7/24/26: Exterior/Interior shear walls and 2nd floor decking walked to verify fastener spacing and location @GL H-J/3-7, Mechanical hardware at interior shear walls per approved plans, corridor ledger fastener and joist spacing per approved plans, pending clips at east wall per detail S500/212 (A34 required at framing parallel to exterior wall), Anchor bolts have not been walked for inspection (SW1 require AB at 48" o.c, SW2 requires AB @ 32" o.c,) |
| 08/03/2026 |
COT - HCBU - Framing |
|
Partial Pass |
|
| 09/02/2026 |
COT - HCBU - Framing |
|
Partial Pass |
|