Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2026 | COT - LCEL - Electrical Underground | Partial Pass | ||
| 06/05/2026 | COT - LCEL - Electrical Underground | Partial Pass | 06/05/2026 Verified (3) 4" sch 40 underground conduit run ~55ft from transformer to switchgear pad. Okay to backfill in progress areas - partial pass. |
|
| 12/12/2025 | COT - LCEL - Electrical Underground | Partial Pass | 12/12/2025 Partial pass. Verified 3" and 4" schedule 40 conduits trenched 20" with a 290ft run. Okay to backfill progress areas with shading materials. |
|
| 12/16/2025 | COT - LCEL - Electrical Underground | Partial Pass | 12/16/2025 remaining 3" line to office building from 800 amp SES at 24" depth. Approximately 290'. Okay to backfill progress areas. Shading required. |