Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2026 | ENGR Engineering Final | Partial Pass | Okay to apply for level 1 TCO. Showroom only, not including demonstration kitchen. |