Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Masonry Pregrout
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 1st lift For elevator hoistway walls. Okay to grout progress areas. 6/12/2026 | |
| 06/16/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass, 2nd lift Elevator hoistway pre grout at 8ft w knockouts in tower approved. 6/16/2026 | |
| 06/17/2026 | COT - HCBU - Masonry Pregrout | Canceled | Canceled per contractor. 6/17/2026 | |
| 06/18/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass 3rd lift Next 8 foot lift. About 40% past 2nd floor elevation. Includes: Horizontal double bond beam at elevator door opening on south wall Vertical and north, east, and south returns (corners only return 8”) Knock outs 8’ below last course installed (above last pre grout inspection line). Okay to grout progress areas. 6/18/2026 |
|
| 06/23/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 4th lift Next 8’ lift w knockouts on elevator hoistway. 1’ into 3rd floor reinforcements approved. Okay to grout progress areas. 6/23/2026 | |
| 06/25/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 5th lift next 8' lift w knockouts on elevator hoist way. Reinforcements approved. Okay to grout progress areas. 6/25/2026 | |
| 06/29/2026 | COT - HCBU - Masonry Pregrout | Partial Pass | Partial pass. 6th lift next 8' lift w knockouts on elevator hoist way. Reinforcements approved. Okay to grout progress areas. 6/29/2026 |