Permit: TC-COM-0925-01698

Parcel: 11705056B


Addresses:

440 N 7TH AV

Inspection Status: Partial Pass

Inspection History: COT - HCPL - Plumbing Progress 

Date Description Inspector Results Comments
05/07/2026 COT - HCPL - Plumbing Progress  Partial Pass Partial pass. 2” drain line tied into sewer main for demonstration kitchen at lease 2 section. Okay to backfill progress areas. 5/7/2026
08/03/2026 COT - HCPL - Plumbing Progress  Partial Pass 8-3-26: 1st floor underground DWV verified under test. Okay to backfill progress areas using shading materials.
Note: pressurize domestic main to a minimum of 50 psi or operating pressure and reschedule this portion of inspection.
08/14/2026 COT - HCPL - Plumbing Progress  Partial Pass
08/21/2026 COT - HCPL - Plumbing Progress  Partial Pass 8/21/2026 Partial pass. Main line 1 1/4" plumbing underground from meter stubbed into lease spaces approved.
08/26/2026 COT - HCPL - Plumbing Progress  Partial Pass 8-26-26: verified in wall electrical at south wall, east wall, kitchen , and west wall at showroom- okay to continue at progress areas. Kitchen demonstration area: Seal north wall DWV exterior wall penetration, fire foam penetration at top plate of demonstration kitchen, add a supports to copper line at 4' intervals horizontally and a support within 4' of copper line vertically at east wall, secure above ceiling can light mc cabling, seal or block east wall of demonstration kitchen. Reschedule when corrections are complete.