Inspection Status: Partial Pass

Inspection History: COT - LCEL - Electrical Underground 

Date Description Inspector Results Comments
03/26/2026 COT - LCEL - Electrical Underground  Partial Pass 3-26-26: partial pass for UFER only.
09/18/2026 COT - LCEL - Electrical Underground  Partial Pass 9/18/26: partial pass on a 4" underground schedule 40 electrical conduit stemming from transformer. Conduit will eventually lead to Building 22's main panel. Okay to backfill progress areas.
09/23/2026 COT - LCEL - Electrical Underground  Partial Pass 9/23/2026 4” schedule 40. Total of three for the secondaries going to each of the building. From transformer location about 20’ in of the edge of curb. Okay to backfill progress areas. Shading required. Ensure caution tape is in place after first lift of compaction.
09/24/2026 COT - LCEL - Electrical Underground  Passed 09/24/2026
Picked up remaining 120' run of 4" sch 40 conduit from near street and transformer to building, trench depth approximately 5'. Okay to backfill, caution burial tape and shading required.