Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2025 | ENGR Engineering Final | Passed | Contractor needs to finish the valley gutter the entrance of the building |