Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | BULD - Electrical Clearance | Passed | Approved 100A 3-phase temporary service panel - TMPP Clearance to TEP is required for the temporary power to booster pump generators |