Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2025 |
COT - LCBU - Building Final |
|
Not Ready |
6/17/25: not ready |
| 07/02/2025 |
COT - LCBU - Building Final |
|
Re-inspection required |
7-2-25: per plans, panel D was to be installed inside establishment and not on the exterior side. Panel D breakers must be labelled per plans and install permanent identification labels for each panel. Either submit a revision reflecting current setup or install per plans. Provide pictures/videos if any previous underground electrical work that may have been covered without inspections. |
| 09/10/2025 |
COT - LCBU - Building Final |
|
Passed |
|