Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCEL - Electrical Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 11/20/2024 | COT - HCEL - Electrical Progress | Re-inspection required | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. |
|
| 11/21/2024 | COT - HCEL - Electrical Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. 11/21/24: electrical underground at splash pad per plan ok to proceed with backfill. |
|
| 12/18/2024 | COT - HCEL - Electrical Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. 11/21/24: electrical underground at splash pad per plan ok to proceed with backfill . 10/14/24: electrical underground for fixtures 36,35,34,33,30 per plans ok to back fill 12" then place caution tape. Total of 8 light pole bases. Rebar, UFER and depth per plan. Stations. 881,880,879,906,878,877,876,882. Okay for concrete placement. 10/24/2024 10/30/24: total 3 light pole bases, 899,903,874. Reinforcement per plan ok to proceed 11/4/24: reinforcement at 4 light pole bases per plan ok to proceed. 887, 892, 893, 870 Total of 8 light pole bases. Rebar, UFER and depth per plan. Stations. 881,880,879,906,878,877,876,882. Okay for concrete placement. 10/24/2024 11/12/24: reinforcement per plans at light pole cages 885,888,889,890,891,894,895,896,897,898. Reinforcement per plan at play ground are Ramada footings . 11/19/24: reinforcement per plan at light pole cage #825, reinforcement per plan at footings for ramada north of splash pad. |