Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2025 | COT - HCPL - Rough Soil | Partial Pass | 12/17/24: sewer connection passed ok to proceed with backfill. 3/20/25: 2" backflow inspection approved and under test, 1" backflow inspection approved and under test. |
|
| 08/11/2025 | COT - HCPL - Rough Soil | Passed | ||
| 12/17/2024 | COT - HCPL - Rough Soil | Partial Pass | 12/17/24: sewer connection passed ok to proceed with backfill. |