Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/24/2025 | COT - HCPL - Plumbing Progress | Not Ready | ||
| 06/25/2025 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. 11/21/24: plumbing underground at splash pad per plans and under 35psi ok to backfill. 12/18/24: plumbing underground for splash pad passed. 6/25/25: Main water line approved. |
|
| 08/11/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 10/31/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 | |
| 11/20/2024 | COT - HCPL - Plumbing Progress | Re-inspection required | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. |
|
| 11/21/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. 11/21/24: plumbing underground at splash pad per plans and under 35psi ok to backfill. |
|
| 12/18/2024 | COT - HCPL - Plumbing Progress | Partial Pass | Partial pass. From point A to point B. Detail (1/C-002) 6 inch drain line from splash pad to surge tank. Okay to backfill progress areas. Shading required. 10/31/2024 11/20/24: leak at 3 three locations. Please provide plumbing plans for splash pad. 11/21/24: plumbing underground at splash pad per plans and under 35psi ok to backfill. 12/18/24: plumbing underground for splash pad passed. |