Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2024 | ENGR Engineering Final | Passed | Note, I asked that the pedestrian walkways be protected from construction by means of fencing or caution tape |