Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/24/2026 |
COT - HCEL - Electrical Final |
|
Not Ready |
Provide printed panel schedule. Label house panel. Secure loose disconnect box for water heater. Secure expansion tank in place. Insulate hot water line at water heater. Provide correct T&P line. Both bathrooms not ADA complaint. Provide signage for bathrooms. Provide GFCI receptacle at counter top left of sink. Island receptacles need to be gfci along with receptacle underneath sink. Provide hammer arrestor at hot line for dishwasher. Provide high water loop for dishwasher. Provide WR receptacles at all exterior locations. Along with barbecue area. Secure loose mc cable underneath grill. Coat ABS pipes on roof. Ensure door swings meet ADA compliance. Provide chlorination report along with air and balance report prior to finals. 24/2026 |
| 05/14/2026 |
COT - HCEL - Electrical Final |
|
Passed |
Approved. All corrections were made. 5/14/2026 |