Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 09/09/2026 |
ENGR Engineering Final
|
|
Passed |
|
| 09/10/2026 |
ENGR Engineering Final
|
|
Partial Pass |
Okay to apply for level 2 TCO - Phase 3 |
| 10/14/2026 |
ENGR Engineering Final
|
|
Partial Pass |
Phase 3 site is clear and complete. There is plastic taped in a few perimeter doors to keep employees out and prevent theft but it can be easily removed in necessity and will be removed prior to occupancy. Okay for level 4 TCO and can be passed pending outstanding conditions are satisfied. |
| 10/27/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to remove all the toolboxes and etc. before they can get an engineering final |
| 11/15/2024 |
ENGR Engineering Final
|
|
Not Ready |
All temporary fencing, tool boxes, equipment, etc. should be removed and construction activities completed prior to engineering final. |
| 12/24/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor cleaned up all the area where they were working, but still have more work to do in the coming year so I gave them a partial pass. |