Inspection Status: Partial Pass

Inspection History: COT - LCBU - Excavation/Rebar/Zoning 

Permit Number - TC-COM-0923-02166

Inspection Description - COT - LCBU - Excavation/Rebar/Zoning 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
06/25/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Screen wall footing (Northwest). approximately 75’ at 8’ x 16”. Electric ufers are in place. Ok to place concrete in progress areas.
07/01/2025 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass West side of sub station project: Northwest area wall footing at approximately 80’, Ok to place concrete in progress areas.
10/25/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Approximately 130´ F3 footing per plan along with vertical reinforcement. Control joints every 20’. Okay for concrete placement. 10/25/2024
10/31/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass Remainder of West wall approximately 100 feet to first corner directing towards the east southeast Control joints, every 20 feet and grounds approximately 40 feet
11/05/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
11/18/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
11/26/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
12/04/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass
12/18/2024 COT - LCBU - Excavation/Rebar/Zoning  Partial Pass