Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
02/26/2025 ENGR Engineering Final Partial Pass Contractors good to pour the head wall for the 18 inch storm drain pipe on the west side of the project
03/12/2025 ENGR Engineering Final Passed
09/25/2024 ENGR Engineering Final Not Ready Contractors not ready for inspection. Will call in when ready.