Inspection Status: Partial Pass
Inspection History: COT - CSOL - Electrical Underground Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 10/07/2026 |
COT - CSOL - Electrical Underground Solar Project |
|
Partial Pass |
10-7-26 Canopy to canopy A,B, and C (1) 3 inch conduit and (3) 1 inch conduit (1) 4" conduit one 1-1/2" at 32" depth in field. Traffic control trench (1) 3 inch pipe at 30 inch depth. Canopy A trench was not walked. Partial pass pending submission of revised plans |
| 10/07/2026 |
COT - CSOL - Electrical Underground Solar Project |
|
Partial Pass |
10-7-26 Canopy to canopy A,B, and C (1) 3 inch conduit and (3) 1 inch conduit at 32" depth in field. Partial pass |