Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCPL - Rough SoilÂ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2026 | COT - LCPL - Rough Soil | Partial Pass | 6.23.26 Partial pass; pending backwater valve and sewer connection. |