Permit: TC-COM-0824-01601

Parcel: 117121940


Addresses:

72 E CONGRESS ST

Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
05/14/2026 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
08/14/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Column footings and wall footings at GL: 1 - 3/ A.0 - D; all rebar inclusive except for columns 3/A, 3/C, 2/C, 2/B, 2/A. Ok to place concrete in progress areas.
10/01/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Stem wall per F4 footing schedule. C1 on page S2.0 Grid line A column 2.
Elevator pit stem wall footing. Per detail 106 on page S3.0. Okay for concrete placement. 10/1/2025
10/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Elevator pad footing at GL: 2/B for pedestal column; footing,(F7) at,8’ x 20’6”. Ok to place concrete in progress areas.