Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 01/08/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
1-8-25, verified rebar/excavation on detail #121. Okay to pour section. |
| 01/22/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
|
| 02/11/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
|
| 02/20/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
|
| 03/20/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Drain trench at approximately 275 feet. Ok to place concrete at first placement at 5”. |
| 03/26/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Re-inspection required |
3-26-25, reinforcement for catch basin south of loading docks. Advised contractor that this inspection would have to be inspected by our engineering department. |
| 04/04/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
East and west tilt panel infill. Reinforcements per plans. Okay for concrete placement. 4/3/2025 |
| 09/25/2025 |
COT - HCBU - Excavation/Rebar/Zoning |
|
Passed |
|