Inspection Status: Partial Pass

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Date Description Inspector Results Comments
01/08/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 1-8-25, verified rebar/excavation on detail #121. Okay to pour section.
01/22/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
02/11/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
02/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass
03/20/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Drain trench at approximately 275 feet. Ok to place concrete at first placement at 5”.
03/26/2025 COT - HCBU - Excavation/Rebar/Zoning  Re-inspection required 3-26-25, reinforcement for catch basin south of loading docks. Advised contractor that this inspection would have to be inspected by our engineering department.
04/04/2025 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass East and west tilt panel infill. Reinforcements per plans. Okay for concrete placement. 4/3/2025
09/25/2025 COT - HCBU - Excavation/Rebar/Zoning  Passed