Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/05/2026 |
ENGR Engineering Final
|
|
Not Ready |
|
| 02/17/2026 |
ENGR Engineering Final
|
|
Not Ready |
Per Building inspections, not ready for final |
| 02/23/2026 |
ENGR Engineering Final
|
|
Passed |
Passing this final inspection allows closure of this permit, and issuance of a Certificate of Occupancy, however, reinspection is still required for compliance with the massage establishment business license. |