Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Masonry Pregrout
Permit Number - TC-COM-0824-01528
Inspection Description - COT - LCBU - Masonry Pregrout
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 06/10/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 06/11/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 06/12/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 1st lift. East wall approximately 90’. Shy 10’ away from north corner. Okay to grout progress areas. 6/12/2025 | |
| 06/17/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 06/18/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 6-18-25: reinforcement on cmu wall located on south side verified per plans. Okay to grout-3rd lift at 12'. | |
| 06/20/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 6-20-25: top out on approximately 140' of south wall -16' 8". | |
| 06/23/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 06/25/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | Second lift of site wall (Southwest) approximately 45 feet at gate entrance. Screen wall South and East at last lift and grout cap< approximately 125’. Ok to,grout progression areas. | |
| 06/26/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 6-26-25: top out at East cmu wall-15' 4"-okay to pour. | |
| 06/27/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 6-27-25: South entrance of west wall is okay to grout 3rd lift at 12'. Video inspection was conducted later in the afternoon for same area. Reinforcement was verified per plans for 4th lift at 16'-okay to grout which is set for 6-30-25 at 0530 hours. Reinforcement on remaining west wall verified and is okay to grout 2nd lift at 8 | |
| 06/30/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 6-30-25: reinforcement on approximately 140' on north cmu wall verified per plans. Okay to grout 1st lift at 4'. | |
| 07/01/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | East side of project West exterior wall at 8’ - 12’, approximately 224’. Ok ^o,grout progress areas. | |
| 07/03/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | North screen wall (12” block) at second lift; approximately 200’ from Northeast corner to West. Ok to grout progress areas. | |
| 07/10/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 07/22/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 07/25/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | 7/25/2025 partial pass, Second lift, west half of the north wall. Approximately 182'. Okay to grout progress areas. | |
| 07/28/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 07/29/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | Third lift on North wall at West half of wall. Ok to .grout progress areas. | |
| 07/30/2025 | COT - LCBU - Masonry Pregrout | Partial Pass | ||
| 08/08/2025 | COT - LCBU - Masonry Pregrout | Partial Pass |