Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Progress
Permit Number - TC-COM-0823-02097
Inspection Description - COT - HCBU - Building Progress
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2025 | COT - HCBU - Building Progress | Partial Pass | Partial pass. South wall 1st floor elevation exterior nailing complete from finished floor to roof. (Soffit not included). 4/4/2025 | |
| 04/08/2025 | COT - HCBU - Building Progress | Partial Pass | 4-8-25, framing for soffits located northeast/south and entry on east side (minus canopy) approved. Okay to continue with construction at progress areas. | |
| 04/21/2025 | COT - HCBU - Building Progress | Re-inspection required | 4/21/2025 nailing at exterior sheathing not per schedule. 1st floor. | |
| 04/23/2025 | COT - HCBU - Building Progress | Partial Pass | Partial pass. South wall 1st floor elevation exterior nailing complete from finished floor to roof. (Soffit not included). 4/4/2025 4-8-25, framing for soffits located northeast/south and entry on east side (minus canopy) approved. Okay to continue with construction at progress areas. 4/21/2025 nailing at exterior sheathing not per schedule. 1st floor. 4/23/25: first floor exterior sheathing approved ok to proceed. |
|
| 04/24/2025 | COT - HCBU - Building Progress | Partial Pass | Level #2 exterior sheathing. Ok to water proof and water surface areas. | |
| 04/28/2025 | COT - HCBU - Building Progress | Re-inspection required | 4-28-25, 3rd floor exterior sheathing- Rooms 3RH019, 3RH009, 3RH001B add screws to loose panels and check spacing at joints and along edges. 3RH045-repair section of torn wall. Okay to continue construction at progress areas but a reinspection is required on listed above rooms. | |
| 04/29/2025 | COT - HCBU - Building Progress | Partial Pass | 4-29-25, screws for exterior sheathing on 3rd floor approved. Okay to continue with construction at progress areas. |