Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCME - Mechanical Above Ceiling
Permit Number - TC-COM-0823-02097
Inspection Description - COT - HCME - Mechanical Above Ceiling
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Levels #1 and #2 in areas A & B; main lines installed and insulated. Lateral ones to be installed when top-out sheet rock has been completed. | |
| 03/05/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 3-5-25, A side- first floor-fire riser room, branch lines for HVAC in north east area, staff locker/staff bathrooms for male & female, quiet room, stg room, medical records, vv109, hall1rh013, 110, elevator room, hall 2, comm room, rr vestibule, lobby. B-side, first floor-serving line,kitchen, dry storage, freezer, kitchen rec trash, service corridor 1rh1018 , men's/woman's restrooms, staff toilet, trash corridor, dietician, engineer, cart wash, vv118-cart wash, stg, men's toilet, central supply 1vi018, housekeeping 1/d1056, dirty wash, exam room, Okay to insulate progress areas noted. |
|
| 08/08/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 8/7/25: 3rd floor East patient rooms above ceiling in hard lid areas approved ok to proceed. | |
| 08/12/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 8/12/25: 3rd floor west patient restrooms hard ceilings | |
| 09/19/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Dining room area, serving area, kitchen, vending area | |
| 09/29/2025 | COT - HCME - Mechanical Above Ceiling | Not Ready | ||
| 10/01/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10-1-25: mechanical at 2nd floor patient rooms together with vestibule at 1st floor verified per plans. Okay to continue with construction at progress areas. | |
| 10/08/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Level #2 at WON door to,South,end of floor. Ok to set,ceiling tiles in progress areas. | |
| 10/17/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10-17-25: 2RH064 & 2TH001-tape tears to wrap around hard duct and connect remaining duct to registers. Will reinspect at upcoming inspection-play to continue construction at progress areas. | |
| 10/22/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10-22-25: mechanical above ceiling at 2nd floor approved, however, there several patient rooms at the 3rd floor that are missing registers and tears to wraps on ductwork. An inspection of the 3rd floor is required. | |
| 10/24/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 10-24-25: 3RH043-Tape tear on flex. Mechanical above ceiling in all other patient rooms approved-okay construction at progress areas. | |
| 10/30/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | First floor elevator area, waiting area and vestibule area; OK to set ceiling tiles in progress areas. | |
| 11/03/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | Level #3, center portion of corridor, mechanical above ceiling. Ok to.drop.ceiling,tiles in,progress areas. | |
| 11/21/2025 | COT - HCME - Mechanical Above Ceiling | Partial Pass | 11-21-25: mechanical above ceiling for room's 3TH001B, 3TH002, 3TH003, gym corridor approved. 3TH005 Not ready-reschedule. Okay to continue with construction at progress areas. |