Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - HCME - Mechanical Above Ceiling

Permit Number - TC-COM-0823-02097

Inspection Description - COT - HCME - Mechanical Above Ceiling

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/27/2025 COT - HCME - Mechanical Above Ceiling Partial Pass Levels #1 and #2 in areas A & B; main lines installed and insulated. Lateral ones to be installed when top-out sheet rock has been completed.
03/05/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 3-5-25, A side- first floor-fire riser room, branch lines for HVAC in north east area, staff locker/staff bathrooms for male & female, quiet room, stg room, medical records, vv109, hall1rh013, 110, elevator room, hall 2, comm room, rr vestibule, lobby.
B-side, first floor-serving line,kitchen, dry storage, freezer, kitchen rec trash, service corridor 1rh1018 , men's/woman's restrooms, staff toilet, trash corridor, dietician, engineer, cart wash, vv118-cart wash, stg, men's toilet, central supply 1vi018, housekeeping 1/d1056, dirty wash, exam room, Okay to insulate progress areas noted.
08/08/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 8/7/25: 3rd floor East patient rooms above ceiling in hard lid areas approved ok to proceed.
08/12/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 8/12/25: 3rd floor west patient restrooms hard ceilings
09/19/2025 COT - HCME - Mechanical Above Ceiling Partial Pass Dining room area, serving area, kitchen, vending area
09/29/2025 COT - HCME - Mechanical Above Ceiling Not Ready
10/01/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 10-1-25: mechanical at 2nd floor patient rooms together with vestibule at 1st floor verified per plans. Okay to continue with construction at progress areas.
10/08/2025 COT - HCME - Mechanical Above Ceiling Partial Pass Level #2 at WON door to,South,end of floor. Ok to set,ceiling tiles in progress areas.
10/17/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 10-17-25: 2RH064 & 2TH001-tape tears to wrap around hard duct and connect remaining duct to registers. Will reinspect at upcoming inspection-play to continue construction at progress areas.
10/22/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 10-22-25: mechanical above ceiling at 2nd floor approved, however, there several patient rooms at the 3rd floor that are missing registers and tears to wraps on ductwork. An inspection of the 3rd floor is required.
10/24/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 10-24-25: 3RH043-Tape tear on flex. Mechanical above ceiling in all other patient rooms approved-okay construction at progress areas.
10/30/2025 COT - HCME - Mechanical Above Ceiling Partial Pass First floor elevator area, waiting area and vestibule area; OK to set ceiling tiles in progress areas.
11/03/2025 COT - HCME - Mechanical Above Ceiling Partial Pass Level #3, center portion of corridor, mechanical above ceiling. Ok to.drop.ceiling,tiles in,progress areas.
11/21/2025 COT - HCME - Mechanical Above Ceiling Partial Pass 11-21-25: mechanical above ceiling for room's 3TH001B, 3TH002, 3TH003, gym corridor approved. 3TH005 Not ready-reschedule. Okay to continue with construction at progress areas.