Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Intermediate
Permit Number - TC-COM-0823-02097
Inspection Description - COT - HCPL - Plumbing Intermediate
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. | |
| 01/30/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. |
|
| 01/31/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. 1/31/25: plumbing in walls per plan and under pressure in rooms (1DI003,1DI014,1DI002,1RH024,1RH023,1DI006,1DI005,1EG007,1EG006,1DI001-1,1RH038,1RH039) |
|
| 02/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level #1, Area B in wall domestic water and waste lines. | |
| 02/19/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Section “B”, domestic water lines in wall at 1/2” - 1” for example rooms and mop sinks. Sanitary lines (2” - 4”) in walls. Area “A” in wall domestic water lines at 1/2” - 1”. DWV lines at 2” - 4” in walls and above ceiling. | |
| 02/21/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2-21-25, primary & secondary storm drains located on northeast side together with condensate lines north of stairwell verified under test. Okay to continue with construction. | |
| 02/26/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic water lines of Level #1, Area A. | |
| 03/03/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic water lines at Level #1, Areas A & B; lines to be insulated. | |
| 03/10/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Hose bibs: 4 each for exterior use. Level #1 Areas A & B waste and vent overhead at 2” - 3”. | |
| 03/18/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 3-18-25, 2nd Floor Area A: In-wall waste and vent, water & medgas for patient rooms 2RH002, 2RH004, east side level A verified under test and approved. Okay to continue construction at progress areas. | |
| 03/20/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. 1/31/25: plumbing in walls per plan and under pressure in rooms (1DI003,1DI014,1DI002,1RH024,1RH023,1DI006,1DI005,1EG007,1EG006,1DI001-1,1RH038,1RH039) 2-21-25, primary & secondary storm drains located on northeast side together with condensate lines north of stairwell verified under test. Okay to continue with construction. 3-18-25, 2nd Floor Area A: In-wall waste and vent, water & medgas for patient rooms 2RH002, 2RH004, east side level A verified under test and approved. Okay to continue construction at progress areas. 3/20/25: Med Gas in-wall approved and under test in Area B East rooms (2RH009, 2RH011, 2RH013, 2RH015, 2RH017, 2RH019, 2RH021, 2RH023, 2RH025, 2RH027), Drain waste and vent and Domestic water approved in-wall in rooms (2RH001, 2RH003, 2RH005, 2RH007, 2RH009), 6” Overflow drain under test at north east corner Area A at second floor. |
|
| 03/24/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. 1/31/25: plumbing in walls per plan and under pressure in rooms (1DI003,1DI014,1DI002,1RH024,1RH023,1DI006,1DI005,1EG007,1EG006,1DI001-1,1RH038,1RH039) 2-21-25, primary & secondary storm drains located on northeast side together with condensate lines north of stairwell verified under test. Okay to continue with construction. 3-18-25, 2nd Floor Area A: In-wall waste and vent, water & medgas for patient rooms 2RH002, 2RH004, east side level A verified under test and approved. Okay to continue construction at progress areas. 3/20/25: Med Gas in-wall approved and under test in Area B East rooms (2RH009, 2RH011, 2RH013, 2RH015, 2RH017, 2RH019, 2RH021, 2RH023, 2RH025, 2RH027), Drain waste and vent and Domestic water approved in-wall in rooms (2RH001, 2RH003, 2RH005, 2RH007, 2RH009), 6” Overflow drain under test at north east corner Area A at second floor. 3/24/25: DWV and domestic water second floor Area A west under test in-wall ok to proceed. 2nd floor Area B west med gas in wall per approved plans ok to proceed. |
|
| 03/26/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 3-26-25, partial pass/ verified under test for domestic water level A- second floor-2th006, DWV -ADL 2th005, DWV-2TH008, 2hr062 & 059, DWV-drinking fountain 2th002 Staff lounge 2rh058 at 2nd floor level B, DWV/dialysis box in Patient room-2rh072, waste & vent, dialysis box in patient room bathroom #14. Med gas nurses station 2hh051. |
|
| 04/02/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 4-2-25, verified per plans and under test on DOMESTIC FOR SECTION B-2RH14, DWV ROOM 2RH16, DWV2RH18, DOMESTIC WATER 2RH20, DOMESTIC2RH22, DOMESTIC-2HR24. Okay to continue with construction at progress areas. | |
| 04/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor patient rooms #26, #28, #30, #32, #34. Domestic water stubbed out to main corridor and DWV on test. #36 ,#38, #40 only DWV, okay to proceed progress areas. 4/4/2025 | |
| 04/07/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Roof level; gas line (containment system) from level one. Level #2, domestic water lines in rooms 36, 38, 40, 42, 46. DWV lines in rooms 50, 54. | |
| 04/08/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 4-8-25, 1st floor kitchen SIDE B-domestic water, DWV 2nd floor SIDE B Room 2RH042,2RH044, 2RH043, 2RH046 hallway vent, 2RH049-Domestic Water, domestic meds room, DWV 2RH50, Staff lounge , soil holding 2RH056-DWV, 2RH043-vent in hallway, 2RH045 vent. 2nd floor SIDE A-room THW001-DWV & domestic water. Okay to continue construction at progress areas. | |
| 04/09/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level,#2, Section A, patient rooms in wall domestic water and domestic DWV. Level #3, room #6 in wall plumbing. | |
| 04/11/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 4-11-25, ground level storm drain northeast section of building verified under test. South canopy DWV-under test, 3rd floor in wall DWV for room, 3HR008 DWV/domestic water, 10 rain drains located on rooftop verified under test. Okay to proceed with construction at progress areas. | |
| 04/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor patient rooms #26, #28, #30, #32, #34. Domestic water stubbed out to main corridor and DWV on test. #36 ,#38, #40 only DWV, okay to proceed progress areas. 4/4/2025 4-8-25, 1st floor kitchen SIDE B-domestic water, DWV 2nd floor SIDE B Room 2RH042,2RH044, 2RH043, 2RH046 hallway vent, 2RH049-Domestic Water, domestic meds room, DWV 2RH50, Staff lounge , soil holding 2RH056-DWV, 2RH043-vent in hallway, 2RH045 vent. 2nd floor SIDE A-room THW001-DWV & domestic water. Okay to continue construction at progress areas. 4-11-25, ground level storm drain northeast section of building verified under test. South canopy DWV-under test, 3rd floor in wall DWV for room, 3HR008 DWV/domestic water, 10 rain drains located on rooftop verified under test. Okay to proceed with construction at progress areas. 4/14/25: third floor Med-Gas in wall approved on East rooms of Area A and B, third floor Med-Gas in wall approved in room 3RH036 and 3RH037, in wall domestic and DWV approved in Area A rooms (3RH010,3RH012,3RH014,3RH016). |
|
| 04/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. 1/31/25: plumbing in walls per plan and under pressure in rooms (1DI003,1DI014,1DI002,1RH024,1RH023,1DI006,1DI005,1EG007,1EG006,1DI001-1,1RH038,1RH039) 2-21-25, primary & secondary storm drains located on northeast side together with condensate lines north of stairwell verified under test. Okay to continue with construction. 3-18-25, 2nd Floor Area A: In-wall waste and vent, water & medgas for patient rooms 2RH002, 2RH004, east side level A verified under test and approved. Okay to continue construction at progress areas. 3/20/25: Med Gas in-wall approved and under test in Area B East rooms (2RH009, 2RH011, 2RH013, 2RH015, 2RH017, 2RH019, 2RH021, 2RH023, 2RH025, 2RH027), Drain waste and vent and Domestic water approved in-wall in rooms (2RH001, 2RH003, 2RH005, 2RH007, 2RH009), 6” Overflow drain under test at north east corner Area A at second floor. 3/24/25: DWV and domestic water second floor Area A west under test in-wall ok to proceed. 2nd floor Area B west med gas in wall per approved plans ok to proceed. 3-26-25, partial pass/ verified under test for domestic water level A- second floor-2th006, DWV -ADL 2th005, DWV-2TH008, 2hr062 & 059, DWV-drinking fountain 2th002 Staff lounge 2rh058 at 2nd floor level B, DWV/dialysis box in Patient room-2rh072, waste & vent, dialysis box in patient room bathroom #14. Med gas nurses station 2hh051. 4-2-25, verified per plans and under test on DOMESTIC FOR SECTION B-2RH14, DWV ROOM 2RH16, DWV2RH18, DOMESTIC WATER 2RH20, DOMESTIC2RH22, DOMESTIC-2HR24. Okay to continue with construction at progress areas. |
|
| 04/17/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor patient rooms #26, #28, #30, #32, #34. Domestic water stubbed out to main corridor and DWV on test. #36 ,#38, #40 only DWV, okay to proceed progress areas. 4/4/2025 4-8-25, 1st floor kitchen SIDE B-domestic water, DWV 2nd floor SIDE B Room 2RH042,2RH044, 2RH043, 2RH046 hallway vent, 2RH049-Domestic Water, domestic meds room, DWV 2RH50, Staff lounge , soil holding 2RH056-DWV, 2RH043-vent in hallway, 2RH045 vent. 2nd floor SIDE A-room THW001-DWV & domestic water. Okay to continue construction at progress areas. 4-11-25, ground level storm drain northeast section of building verified under test. South canopy DWV-under test, 3rd floor in wall DWV for room, 3HR008 DWV/domestic water, 10 rain drains located on rooftop verified under test. Okay to proceed with construction at progress areas. 4/14/25: third floor Med-Gas in wall approved on East rooms of Area A and B, third floor Med-Gas in wall approved in room 3RH036 and 3RH037, in wall domestic and DWV approved in Area A rooms (3RH010,3RH012,3RH014,3RH016). 4/17/25: Secondaries storm drain per plan and under pressure, primaries not under pressure re-inspection required. Area A plumbing above ceiling under test ok to insulate. |
|
| 04/18/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor patient rooms #26, #28, #30, #32, #34. Domestic water stubbed out to main corridor and DWV on test. #36 ,#38, #40 only DWV, okay to proceed progress areas. 4/4/2025 4-8-25, 1st floor kitchen SIDE B-domestic water, DWV 2nd floor SIDE B Room 2RH042,2RH044, 2RH043, 2RH046 hallway vent, 2RH049-Domestic Water, domestic meds room, DWV 2RH50, Staff lounge , soil holding 2RH056-DWV, 2RH043-vent in hallway, 2RH045 vent. 2nd floor SIDE A-room THW001-DWV & domestic water. Okay to continue construction at progress areas. 4-11-25, ground level storm drain northeast section of building verified under test. South canopy DWV-under test, 3rd floor in wall DWV for room, 3HR008 DWV/domestic water, 10 rain drains located on rooftop verified under test. Okay to proceed with construction at progress areas. 4/14/25: third floor Med-Gas in wall approved on East rooms of Area A and B, third floor Med-Gas in wall approved in room 3RH036 and 3RH037, in wall domestic and DWV approved in Area A rooms (3RH010,3RH012,3RH014,3RH016). 4/17/25: Secondaries storm drain per plan and under pressure, primaries not under pressure re-inspection required. Area A plumbing above ceiling under test ok to insulate. 4/18/25: primary storm drains under pressure ok to proceed. |
|
| 04/24/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | In wall DVW at Level #3, Lines2” - 4” for rooms 18 - 32. Level #2 DVW at 2” - 4” at rooms 18 - 32. Level #1, Southeast portion DWV at 2”. | |
| 04/30/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 4-30-25, 3rd floor med-gas vacuum & oxygen lines on rooms 3RH031,3RH034, 3RH038, 3HR041, 3RH045, 3RH047, corridor in front of nurses station. DWV in wall 3RH034, waste & vent 3RH036, waste & Vent 3RH042. Okay to proceed with construction at progress areas. Note: framing at rooftop verified together with air barrier along entire east side. Okay to continue with construction at progress areas. |
|
| 05/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level #3, Area B; DWV lines at 2” - 4”. In wall DV at rooms: 3RH; 038, 043, 044, 046, 048, 049, 050, 056 (2” - 4”). | |
| 05/08/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 5-8-25, 2" black gas line from mechanical room to kitchen area on 1st floor verified under test at 60psi. Domestic water line on 2nd floor Side A-room # 2RH004 inspected & approved. Okay to continue with construction at progress areas. | |
| 05/13/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 5-13-25-overhead DWV on 1st floor along the Southwest area of Side B together with main electrical/emergency electrical rooms verified under test and per approved plans. Okay to continue with construction at progress areas. | |
| 05/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 5-14-25, overhead domestic on Second level Side-A room's 2RH010, 2HR008, 2RH006, 2TH008 verified under test and per plans.Okay to proceed with construction at progress areas. | |
| 05/16/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 5-16-25, 2nd floor Side A -domestic & waste/vent verified per plans and under test on room's 2RH049A, over head waste & vent in cleaning supply room & meds room, soiled holding room, domestic water in nourishment room, soil material room, adult patient room 2TH006, 2RH012, 2RH014, 2RH016. Okay to continue with construction at progress areas. | |
| 05/19/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1/17/25: plumbing in walls per plan and under pressure in rooms (1RH012,1RH010,1EG016,1AM007,1RH015,1RH016,) ok to proceed. 1/30/25: DWV plumbing in walls in rooms 4" in 1DI001-1 under pressure, DVW in room 1DI003, 1DI005 DWV under test, 1DI007 DVW under test. 1/31/25: plumbing in walls per plan and under pressure in rooms (1DI003,1DI014,1DI002,1RH024,1RH023,1DI006,1DI005,1EG007,1EG006,1DI001-1,1RH038,1RH039) 2-21-25, primary & secondary storm drains located on northeast side together with condensate lines north of stairwell verified under test. Okay to continue with construction. 3-18-25, 2nd Floor Area A: In-wall waste and vent, water & medgas for patient rooms 2RH002, 2RH004, east side level A verified under test and approved. Okay to continue construction at progress areas. 3/20/25: Med Gas in-wall approved and under test in Area B East rooms (2RH009, 2RH011, 2RH013, 2RH015, 2RH017, 2RH019, 2RH021, 2RH023, 2RH025, 2RH027), Drain waste and vent and Domestic water approved in-wall in rooms (2RH001, 2RH003, 2RH005, 2RH007, 2RH009), 6” Overflow drain under test at north east corner Area A at second floor. 3/24/25: DWV and domestic water second floor Area A west under test in-wall ok to proceed. 2nd floor Area B west med gas in wall per approved plans ok to proceed. 3-26-25, partial pass/ verified under test for domestic water level A- second floor-2th006, DWV -ADL 2th005, DWV-2TH008, 2hr062 & 059, DWV-drinking fountain 2th002 Staff lounge 2rh058 at 2nd floor level B, DWV/dialysis box in Patient room-2rh072, waste & vent, dialysis box in patient room bathroom #14. Med gas nurses station 2hh051. 4-2-25, verified per plans and under test on DOMESTIC FOR SECTION B-2RH14, DWV ROOM 2RH16, DWV2RH18, DOMESTIC WATER 2RH20, DOMESTIC2RH22, DOMESTIC-2HR24. Okay to continue with construction at progress areas. 5/19/25: plumbing in wall approved in rooms 3TH001,3TH006,3RH060,3TH003,3PH001. |
|
| 05/27/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Duplicate request. | |
| 05/27/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level #1, Section B; domestic water lines at 3/4” - 3” in room units and corridors. | |
| 06/03/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic water lines over head in rooms 2rh020-2rh026 and 2rh030. Okay to proceed progress areas. 6/3/2025 | |
| 06/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 6/4/2025 OH domestic water 2nd floor Area B. 2RH032-2RH042. Okay to proceed progress areas. | |
| 06/05/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 6/5/2025 Overhead domestic water 2nd floor area B. 2RH056, 2RH049(Lav), 2RH048, 2RH046, 2RH044. Okay to proceed progress areas. | |
| 06/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor OH 2RH028 3rd floor area A west. 3TH006,3RH060, Two lavs corridor area A west. Speech therapy room (lav). Janitors closet 3RH059. Staff bathroom 3RH058, nourishment room 3PH001, 3PH002. In wall and over head approved. Okay to proceed progress areas. 6/6/2025 |
|
| 06/10/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Overhead Domestic Water 3rd Floor Area A. 3RH028, 3RH026, 3RH024, 3RH022, 3RH018, 3RH016, 3RH014. Pending condensation lines. 6/10/2025 | |
| 06/11/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 3RH030, 3RH032, 3RH034, 3RH036, 3RH038, 3RH040. Condensation line in room 3RH024. Okay to proceed progress areas. 6/11/2025 | |
| 06/13/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level 3 in wall and OH 3RH042, 3RH044, 3RH046, 3RH048. Okay to proceed progress areas. 6/13/2025 | |
| 06/17/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 6-17-25: in wall domestic on 3rd floor verified under test and per plans in Cleaning supply room,soil holding room, staff lounge-domestic and condensation, meds room-domestic. Okay to continue with construction at progress areas. | |
| 06/23/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 6/23/25:inspections at Level #3: Area A; DWV in rooms 3RH001 - 3RH014 | |
| 08/11/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Vent line (4”) in shaft at Level #1 to roof level. Vent lines at 1 1/2” - 3” lines in Area 3 West |