Inspection Status: Partial Pass

Inspection History: COT - HCBU - Framing

Permit Number - TC-COM-0823-02097

Inspection Description - COT - HCBU - Framing

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/23/2025 COT - HCBU - Framing Partial Pass partial pass. 1st floor interior framing approved. Pending elevators areas, store front framing and exterior framing at all of west end. Okay to proceed progress areas. 12/27/2024
1/23/25: second floor area A framing approved. First floor elevator approved.
02/20/2025 COT - HCBU - Framing Partial Pass partial pass. 1st floor interior framing approved. Pending elevators areas, store front framing and exterior framing at all of west end. Okay to proceed progress areas. 12/27/2024
1/23/25: second floor area A framing approved. First floor elevator approved.
2/20/25: second floor area B framing approved.
04/03/2025 COT - HCBU - Framing Partial Pass 4-3-25, framing on Side A 3RD LEVEL-3RH029, 3RH031, 3RH027, 3RH025, 3RH023, 3RH021, 3RH019-missing shot pins, 3RH017, 3RH015, 3RH013, 3RH011, 3RH009, 3RH007, 3HR005, 3RH003, 3RH001, 3RH002, 3TH006, 3RH059, 3RH058,3RH001, 3RH057,3RH002 , 3EG004. Okay to continue with construction at progress areas.
04/07/2025 COT - HCBU - Framing Partial Pass West side of building, Levels 2 - 3; Northeast and South East corners of building. Ok to cover progress areas.
04/15/2025 COT - HCBU - Framing Partial Pass 4/15/2025 partial pass. 3rd floor west rooms from south to elevator. Pending framing for shaft liner at HVAC. Okay to proceed progress areas.
04/29/2025 COT - HCBU - Framing Partial Pass 4-29-25, air barrier on 1st floor approved. Okay to continue with construction at progress areas.
07/08/2025 COT - HCBU - Framing Partial Pass partial pass. 1st floor interior framing approved. Pending elevators areas, store front framing and exterior framing at all of west end. Okay to proceed progress areas. 12/27/2024
1/23/25: second floor area A framing approved. First floor elevator approved.
2/20/25: second floor area B framing approved.
4-3-25, framing on Side A 3RD LEVEL-3RH029, 3RH031, 3RH027, 3RH025, 3RH023, 3RH021, 3RH019-missing shot pins, 3RH017, 3RH015, 3RH013, 3RH011, 3RH009, 3RH007, 3HR005, 3RH003, 3RH001, 3RH002, 3TH006, 3RH059, 3RH058,3RH001, 3RH057,3RH002 , 3EG004. Okay to continue with construction at progress areas.

4/15/2025 partial pass. 3rd floor west rooms from south to elevator. Pending framing for shaft liner at HVAC. Okay to proceed progress areas.
4-29-25, air barrier on 1st floor approved. Okay to continue with construction at progress areas.
7/8/25: Canopy framing at east entry per approved plans A32-08/1,8,10
07/25/2025 COT - HCBU - Framing Partial Pass Elevator alcove area at Level #2. Ok to cover progress areas.
08/12/2025 COT - HCBU - Framing Partial Pass 8/12/25: 3rd floor west patient restrooms hard ceilings
08/19/2025 COT - HCBU - Framing Partial Pass 8-19-25: framing at elevator shaft on 3rd floor approved. Okay to proceed with construction at progress areas.
08/22/2025 COT - HCBU - Framing Partial Pass 8/21/25:Hard ceiling at top of north stair approved.
08/26/2025 COT - HCBU - Framing Partial Pass Level #3, shaft South of elevators: sheet rocked and Fire caulked.
09/12/2025 COT - HCBU - Framing Partial Pass Level #3, Section B day room ceiling. Ok to sheet rock progress areas.
09/19/2025 COT - HCBU - Framing Partial Pass Level #3, above ceiling and soffit,areas in Section A ( center portion). Ok to cover progress areas.
10/01/2025 COT - HCBU - Framing Partial Pass 10-1-25: fire caulk/firefoam or add a section of drywall to damage wall at 2nd floor elevator lobby just above elevator doors- provide a picture or reschedule an inspection. Okay to continue with constr at 1st floor Vestibule area.
10/17/2025 COT - HCBU - Framing Partial Pass 10-17-25: missing screws at 3rd floor hard ceiling metal framing outside of elevators along the west and north side of track-Reinspection required. 2TH004 hard ceiling framing approved- okay to continue construction at this room.
10/21/2025 COT - HCBU - Framing Partial Pass 10-21-25: okay to continue with construction at the hard ceiling of the 3rd floor elevator lobby.
12/27/2024 COT - HCBU - Framing Partial Pass partial pass. 1st floor interior framing approved. Pending elevators areas, store front framing and exterior framing at all of west end. Okay to proceed progress areas. 12/27/2024