Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2026 | COT - HCBU - Building Final | Partial Pass | 1/7/25:Emergency Egress Lighting walk through | |
| 01/16/2026 | COT - HCBU - Building Final | Passed | 1/16/26: OKAY FOR LEVEL 4 TCO | |
| 12/04/2025 | COT - HCBU - Building Final | Partial Pass | 12/3/25: Level 1 TCO approved for the 1st floor only. The building must not be occupied at any time under this TCO. A Level 1 TCO authorizes stocking and furniture placement only. Approval from Fire, Engineering, and Right-of-Way is required before submitting a Level 1 TCO request. Without their approval, the TCO will not be issued. 12/3/25: general walk through of the first floor (not ready for building final inspection) |