Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2025 | COT - HCPL - Rough Soil | Passed | ||
| 07/05/2024 | COT - HCPL - Rough Soil | Partial Pass | Plumbing in slab on test and approved. Okay to backfill. Shading is required. 7/5/2024 | |
| 10/03/2024 | COT - HCPL - Rough Soil | Partial Pass | Plumbing in slab on test and approved. Okay to backfill. Shading is required. 7/5/2024 10/3/24: MWL from meter to building stub-up under pressure ok to backfill progress area, pending point of connection at at meter and building. HCS connection needs to be made under revision not in plans. Ok to proceed |