Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Building Final
Permit Number - TC-COM-0823-02055
Inspection Description - COT - HCBU - Building Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | COT - HCBU - Building Final | Partial Pass | Mechanical, electrical, and plumbing work is complete per plans. All fixtures are installed and operational. Electrical panels are properly labeled with lockout on hot water heater breaker. Okay to issue a Level 3 TCO for this permit. | |
| 04/18/2025 | COT - HCBU - Building Final | Re-inspection required | 4-18-25, insulate 2" water line on south side of building, add secure clips to A/C whips, lower lavatory height to each bathroom to 34" o.c., and install men's/woman signs for each restroom, paint all exterior pvc, and adjust men's/woman's door pressure to 5 pounds. | |
| 04/22/2025 | COT - HCBU - Building Final | Passed | 4-22-25, building final approved. See pending conditions. |