Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/02/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/2/24: Partial Pass for Electrical conduits installed in trench from the east side of property to the north side of property. Okay to shade pipes and backfill trenches. | |
02/12/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/12/24: okay to back fill trenches at 2627 and 2609 for safety reasons still need inspections done | |
02/21/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/21/24: Light pole conduit trenches on North side of building east of unit 2559 is okay to shade and backfill trench. | |
02/28/2024 | COT - HCEL - Electrical Underground | Not Ready | canceled | |
03/08/2024 | COT - HCEL - Electrical Underground | Partial Pass | 3/8/24 - 4 conduits from transformer to west side building with suite # 2545 - ok to backfill. Conduits for 4 east light pole footings ok. |
|
03/13/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/2/24: Partial Pass for Electrical conduits installed in trench from the east side of property to the north side of property. Okay to shade pipes and backfill trenches. 2/12/24: okay to back fill trenches at 2627 and 2609 for safety reasons still need inspections done 2/21/24: Light pole conduit trenches on North side of building east of unit 2559 is okay to shade and backfill trench. 3/8/24 - 4 conduits from transformer to west side building with suite # 2545 - ok to backfill. Conduits for 4 east light pole footings ok. 3/13/24: underground electrical from suites 2547, 2555, and 2559, to the transformer pad. only backfill the main trenches and leave the sweeps into the transformer open for future inspection. |
|
03/15/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
03/19/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
03/21/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
03/26/2024 | COT - HCEL - Electrical Underground | Passed | All electric conduits are installed (2 1/2” - 1”). Ok to cover progress areas. North site wall at 4’ is complete. Ok to grout progress areas |