Permit: TC-COM-0823-01925

Parcel: 12509012A


Addresses:

2545 E BROADWAY BL

Inspection Status: Partial Pass

Inspection History: COT - HCEL - Electrical Underground 

Date Description Inspector Results Comments
02/02/2024 COT - HCEL - Electrical Underground  Partial Pass 2/2/24: Partial Pass for Electrical conduits installed in trench from the east side of property to the north side of property. Okay to shade pipes and backfill trenches.
02/12/2024 COT - HCEL - Electrical Underground  Partial Pass 2/12/24: okay to back fill trenches at 2627 and 2609 for safety reasons still need inspections done
02/21/2024 COT - HCEL - Electrical Underground  Partial Pass 2/21/24: Light pole conduit trenches on North side of building east of unit 2559 is okay to shade and backfill trench.
02/28/2024 COT - HCEL - Electrical Underground  Not Ready canceled
03/08/2024 COT - HCEL - Electrical Underground  Partial Pass 3/8/24 - 4 conduits from transformer to west side building with suite # 2545 - ok to backfill.
Conduits for 4 east light pole footings ok.
03/13/2024 COT - HCEL - Electrical Underground  Partial Pass 2/2/24: Partial Pass for Electrical conduits installed in trench from the east side of property to the north side of property. Okay to shade pipes and backfill trenches.
2/12/24: okay to back fill trenches at 2627 and 2609 for safety reasons still need inspections done
2/21/24: Light pole conduit trenches on North side of building east of unit 2559 is okay to shade and backfill trench.
3/8/24 - 4 conduits from transformer to west side building with suite # 2545 - ok to backfill.
Conduits for 4 east light pole footings ok.
3/13/24: underground electrical from suites 2547, 2555, and 2559, to the transformer pad. only backfill the main trenches and leave the sweeps into the transformer open for future inspection.
03/15/2024 COT - HCEL - Electrical Underground  Partial Pass
03/19/2024 COT - HCEL - Electrical Underground  Partial Pass
03/21/2024 COT - HCEL - Electrical Underground  Partial Pass
03/26/2024 COT - HCEL - Electrical Underground  Passed All electric conduits are installed (2 1/2” - 1”). Ok to cover progress areas.
North site wall at 4’ is complete. Ok to grout progress areas