Parcel: 13629003F


Addresses:

8116 E ESCALANTE RD


Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0823-01905

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
05/03/2024 ENGR Engineering Final Not Ready The contractor Derosso construction is still working on the upper and lower Lincoln Park areas that still has construction fence located at both locations. At lower Lincoln. They are laying down ABC for the new parking lot. The payment will be brought in the latter part of next week or the following week to be completed, and then final inspections will be called in.
05/17/2024 ENGR Engineering Final Not Ready Pedestrian pathway from the west parking lot into the park or non-compliant for running slopes exceeding 5% at this time and cannot be Approved for use. This inspection will be completed again next week to verify if modifications have been done or if a TCO is authorized.
05/21/2024 ENGR Engineering Final Partial Pass in the sidewalk in the island area from the west parking lot going towards the dog park needs railing exceeds the 5% running slope. The walkway from the parking lot towards the dog park area NONCOMPLIANT exceeds 5% running slope in the handicap ramp for this north by the tree is noncompliant. The playground area east of the shade area needs a railing and the sidewalk east of the shade area needs railing. OK for level four.
06/04/2024 ENGR Engineering Final Partial Pass The pal. area in the walkway from the west parking lot to the dog park is a NONCOMPLIANT
06/06/2024 ENGR Engineering Final Passed Cross slope in pedestrian access lane meets the or is better than the required slope of 5%.
12/18/2023 ENGR Engineering Final Not Ready Contractor continues to work on the park per plan call in inspection when completed her final inspection