Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 12408233A


Addresses:

1303 E BROADWAY BL


Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Permit Number - TC-COM-0823-01900

Inspection Description - ENGR Engineering Final

Inspection Status - Partial Pass

Date Description Inspector Results Comments
03/12/2024 ENGR Engineering Final Partial Pass have concerns aboutADA parking.
03/13/2024 ENGR Engineering Final Partial Pass on north side of building:

ADA parking space should be labeled “van accessible”, to include signage (on pavement and on a post or on /building),

east west painted pavement hatching should extend farther west to connect with concrete apron,

bicycle parking should be oriented such to not interfere with ADA building accessibility.

resubmit engineer/architect stamped plans for COT approval.

good for level 4 certificate of occupancy.
04/29/2024 ENGR Engineering Final Passed Site per DP/Prior discussion. Complete and passed for C of O