Inspection Status: Partial Pass
Inspection History: COT - HCBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 01/12/2026 |
COT - HCBU - Preslab |
|
Partial Pass |
Level Two |
| 01/28/2026 |
COT - HCBU - Preslab |
|
Passed |
|
| 10/29/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
10/29/25 Partial pass for elevator shafts, ok to pour concrete |
| 11/18/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
perimeter footing and stem walls for elevator Two. also looked at ufer |
| 11/19/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
Interior pad footings West side. |
| 11/20/2025 |
COT - HCBU - Preslab |
|
Canceled |
|
| 11/21/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
Interior Footings |
| 11/21/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
westside |
| 11/24/2025 |
COT - HCBU - Preslab |
|
Partial Pass |
ground level |