Inspection Status: Partial Pass

Inspection History: COT - HCBU - Preslab  

Date Description Inspector Results Comments
01/12/2026 COT - HCBU - Preslab   Partial Pass Level Two
01/28/2026 COT - HCBU - Preslab   Passed
10/29/2025 COT - HCBU - Preslab   Partial Pass 10/29/25 Partial pass for elevator shafts, ok to pour concrete
11/18/2025 COT - HCBU - Preslab   Partial Pass perimeter footing and stem walls for elevator Two. also looked at ufer
11/19/2025 COT - HCBU - Preslab   Partial Pass Interior pad footings West side.
11/20/2025 COT - HCBU - Preslab   Canceled
11/21/2025 COT - HCBU - Preslab   Partial Pass Interior Footings
11/21/2025 COT - HCBU - Preslab   Partial Pass westside
11/24/2025 COT - HCBU - Preslab   Partial Pass ground level