Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCBU - Stem Wall/Retaining Wall
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Retaining wall for lots 93-109: footing excavation and reinforcement is good. Okay to pour footing. | |
| 09/10/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Retaining wall for lots 65-73: footing excavation and reinforcement is good. Okay to pour. | |
| 09/16/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | 1st lift approved rear of lots 61,60,59,58,57,56,55 & 73,72,71,70,69,68,67,66,65. Okay to grout all progress areas. Footings for lots 53,52,51,50,49 approved. Okay for concrete placement. |
|
| 09/21/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Retaining wall for lot 48 footing excavation and reinforcement is good. Okay to pour. | |
| 10/20/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | 10.20.26 Partial pass; Lots 28 and 29 footing and rebar (plans schedule for Porto II wallscalled for 3 #5 at Top and contractor ran them in the bottom)for 2 ft post tension walls. |
|
| 10/21/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | Between lot 26 ad 27. Footing Excavation and Reinforcing correct for 3 course Proto 2 Tension wall. Control Joints correct. Okay to pour footer. | |
| 10/26/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | 2 Retaining walls footings between lots 25, 26 and 25, 24 are correct. Okay to pour footings. | |
| 10/28/2026 | COT - LCBU - Stem Wall/Retaining Wall | Partial Pass | 2 Lateral 3 course retaining wall footers between 24,23 and 23, 22 okay to pour. | |
| COT - LCBU - Stem Wall/Retaining Wall | Scheduled |