Inspection Status: Partial Pass
Inspection History: COT - CSOL - Grounding/Bonding Solar Project
| Date |
Description |
Inspector |
Results |
Comments |
| 02/10/2026 |
COT - CSOL - Grounding/Bonding Solar Project |
|
Partial Pass |
Schedule 40 at 24" - 36" depth. (4) 1st inverter. X4 3" x3 going into inverter x1 going out. X1 1" coming out of inverter. Tied into inverter (3). X2 3" feeding in along with 1" feeding data. 3" going out along with 1 1/2". (2) x2 bypassing tied in with 1 1/2". 1 " for data. (1) . All tied in together with all inverters in parentheses. Total of 13 feeding and 1 that is conjoining at same location. 2 are data's feeding in. Okay to backfill all progress areas. Shading required. 2/10/2026 |
| 04/14/2026 |
COT - CSOL - Grounding/Bonding Solar Project |
|
Passed |
|