Permit: TC-COM-0725-01440

Parcel: 13609019E


Addresses:

2401 S HOUGHTON RD

Inspection Status: Partial Pass

Inspection History: COT - CSOL - Grounding/Bonding Solar Project

Date Description Inspector Results Comments
02/10/2026 COT - CSOL - Grounding/Bonding Solar Project Partial Pass Schedule 40 at 24" - 36" depth. (4) 1st inverter. X4 3" x3 going into inverter x1 going out. X1 1" coming out of inverter. Tied into inverter (3). X2 3" feeding in along with 1" feeding data. 3" going out along with 1 1/2". (2) x2 bypassing tied in with 1 1/2". 1 " for data. (1) . All tied in together with all inverters in parentheses. Total of 13 feeding and 1 that is conjoining at same location. 2 are data's feeding in. Okay to backfill all progress areas. Shading required. 2/10/2026
04/14/2026 COT - CSOL - Grounding/Bonding Solar Project Passed