Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - CSOL - Electrical Underground Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/29/2026 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | 01/29/2026 Partial pass. Verified 36" trench running 100yd of (3) 2" PVC, (2) 1" PVC, (1) 1" PVC schedule 40 conduit from gear rack to panelboard. Okay to backfill with shading materials and proceed. |
|
| 02/04/2026 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | 02/04/2026 Partial pass. Verified 36" trench running 150ft of (3) 2" PVC schedule 40 conduit to inverter 4. Okay to backfill with shading materials and caution burial tape above. |
|
| 02/10/2026 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | Schedule 40 at 24" - 36" depth. (4) 1st inverter. X4 3" x3 going into inverter x1 going out. X1 1" coming out of inverter. Tied into inverter (3). X2 3" feeding in along with 1" feeding data. 3" going out along with 1 1/2". (2) x2 bypassing tied in with 1 1/2". 1 " for data. (1) . All tied in together with all inverters in parentheses. Total of 13 feeding and 1 that is conjoining at same location. 2 are data's feeding in. Okay to backfill all progress areas. Shading required. 2/10/2026 | |
| 02/18/2026 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | Schedule 40 PVC at a 48" depth. Continuous of the x3 2" and x3 1" from previous inspection from panel board running and tied into new gear rack. 3/4" from panel board to disconnect. (For ct current transmitter). 3" from main disconnect tied into gear rack. (Separate trench). Okay to backfill all progress areas. Shading material required. Ensure caution tape is in place after first lift of compaction. 2/18/2026 | |
| 04/14/2026 | COT - CSOL - Electrical Underground Solar Project | Passed |