| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | COT - LCBU - Building Final | Re-inspection required | 2-13-26: Panel schedule not per plans, mini split breaker is under amped-plans call for a 30 amp breaker-see electrical plan and add arch-fault breakers where required, add R3 Insulation hot leg of tankless water heater, anchor/secure mini split to pad,cut clean outs to grade and paint, remove bottom 12" of drywall at bottom sections to verify pressure treated wood together with shot pins at wall infill, remove 12" of the drywall base at lavatory to verify plumbing piping was installed per plans and excavate pockets of the exterior underground plumbing for same, new plumbing requires a pressure test, mini split installed is missing a UL listing- either install mini split with cassette that is called for on plans or contact UL listing or Intertek and request an inspection. If current mini split is authorized by either UL or Intertek then submit documentation together with a mechanical revision to the city for review. Have your licensed contractor submit a letter to the city documenting that the 5/8" drywall nailing was installed per plans and meets code requirements, install correct lavatory and install per plans. | |
| 05/19/2026 | COT - LCBU - Building Final | Re-inspection required | 5-19-26: made contact with Vanessa Doxin at the residence who refused me entry. | |
| 07/10/2026 | COT - LCBU - Building Final | Partial Pass | 7/10/26: per previous notes, sill plate is not treated and will need to be replaced, wiring must be secured within 12" of receptacle box, all penetrations at top plates must be sealed, draft stop required at garage wall, sink must be ADA compliant, floor at garage must be leveled. Exit light with emergency back up required. Additional items may be added. | |
| 09/03/2026 | COT - LCBU - Building Final | Re-inspection required | 2-13-26: Panel schedule not per plans, mini split breaker is under amped-plans call for a 30 amp breaker-see electrical plan and add arch-fault breakers where required, add R3 Insulation hot leg of tankless water heater, anchor/secure mini split to pad,cut clean outs to grade and paint, remove bottom 12" of drywall at bottom sections to verify pressure treated wood together with shot pins at wall infill, remove 12" of the drywall base at lavatory to verify plumbing piping was installed per plans and excavate pockets of the exterior underground plumbing for same, new plumbing requires a pressure test, mini split installed is missing a UL listing- either install mini split with cassette that is called for on plans or contact UL listing or Intertek and request an inspection. If current mini split is authorized by either UL or Intertek then submit documentation together with a mechanical revision to the city for review. Have your licensed contractor submit a letter to the city documenting that the 5/8" drywall nailing was installed per plans and meets code requirements, install correct lavatory and install per plans. 5-19-26: made contact with Vanessa Doxin at the residence who refused me entry. 7/10/26: per previous notes, sill plate is not treated and will need to be replaced, wiring must be secured within 12" of receptacle box, all penetrations at top plates must be sealed, draft stop required at garage wall, sink must be ADA compliant, floor at garage must be leveled. Exit light with emergency back up required. Additional items may be added. |