Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - LCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2026 | COT - LCEL - Electrical Underground | Partial Pass | Partial pass unit 11 16 35 and 36 | |
| 06/17/2026 | COT - LCEL - Electrical Underground | Partial Pass | Partial pass. Staring from laundry room ran around unit 19 up to 18. F11 2" conduit F12 2" conduit F13&14 2" conduit. 1 spare of 2" schedule 40 at a depth of 28" depth. Ensure caution tape is in place after 1st lift of compaction. Okay to backfill all progress areas. 6/17/2026 | |
| 06/22/2026 | COT - LCEL - Electrical Underground | Partial Pass | 2” conduit to main from ground box. From unit to unit (5-11) 1 1/2” conduit schedule 40 at 24” depth. (16-22) Unit 33-34 2” from main ground box to pedestal east to west approximately 40’. Okay to backfill all progress areas. Ensure after first lift of compaction caution tape is in place. Shading required. 6/22/2026 | |
| 06/24/2026 | COT - LCEL - Electrical Underground | Partial Pass | 06/24/2026 Partial pass. Verified ~100' run from Units 16-19 using (3) 2" sch 40 conduit in 28" trench depth and caution tape above, another ~100' run from Units 29-30 and a 20' run between Unit 33 & 34 using same materials. Okay to backfill progress areas. |
|
| 06/25/2026 | COT - LCEL - Electrical Underground | Partial Pass | 6.25.26 | |
| 06/29/2026 | COT - LCEL - Electrical Underground | Partial Pass | 06/29/2026 Partial pass. Verified approximate run of 60' from Unit 25-33 using 1.5" sch 40 conduit with 28" depth. And ~35' run from Unit 37-44 sch 40 1.5" and 2" conduit, depth of 28". Okay to backfill. |