Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/17/2025 | ENGR Engineering Final | Partial Pass | 12/17/25 Okay for TCO level 4. Dumpster in front is scheduled for removal today Gate 2 needs a dead bolt with a push pull per plans. Gate 1 grade 1 panic hardware is not installed completely. Additionally the egress gate from rear parking area to the front also needs panic grade 1 hardware. Remove padlock from gate with panic bar here. Reschedule Engineering final when ready. |