Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCEL - Electrical Underground
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2025 | COT - HCEL - Electrical Underground | Partial Pass | Total of x6 3” and x1 1 1/2” underground running from electrical room (1168)(switch gear) through general office (115) and stubbed out of building to future transformer location. 3/0AWG ground in place. Okay to backfill progress areas. Shading material required. 10/15/2025 |
|
| 11/10/2025 | COT - HCEL - Electrical Underground | Partial Pass | under sidewalk; transformer pad left to inspect. | |
| 11/13/2025 | COT - HCEL - Electrical Underground | Passed |