Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - CSOL - Electrical Underground Solar Project
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/09/2026 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | X2 3" conduit schedule 40 coming from switch gear ran across the roadway to Array D. x2 1" 1 will be for weather system and the other is a spare. At a depth of 42" across the roadway. 36" at v ditch from new riser location. Rigid risers. Okay to backfill all progress areas. 2/9/2026 | |
| 03/24/2026 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 12/04/2025 | COT - CSOL - Electrical Underground Solar Project | Partial Pass | 12.04.2025 Partial pass. Approved per plan underground Schedule 40 conduit cluster & Schedule 80 riser conduit with a 150ft run. Verified conduit sizes and count. Okay for concrete placement of pad for switch gear box. |