Inspection Status: Partial Pass

Inspection History: COT - CSOL - Electrical Underground Solar Project

Date Description Inspector Results Comments
02/09/2026 COT - CSOL - Electrical Underground Solar Project Partial Pass X2 3" conduit schedule 40 coming from switch gear ran across the roadway to Array D. x2 1" 1 will be for weather system and the other is a spare. At a depth of 42" across the roadway. 36" at v ditch from new riser location. Rigid risers. Okay to backfill all progress areas. 2/9/2026
03/24/2026 COT - CSOL - Electrical Underground Solar Project Passed
12/04/2025 COT - CSOL - Electrical Underground Solar Project Partial Pass 12.04.2025
Partial pass. Approved per plan underground Schedule 40 conduit cluster & Schedule 80 riser conduit with a 150ft run. Verified conduit sizes and count. Okay for concrete placement of pad for switch gear box.