Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCME - Mechanical FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/21/2025 | COT - LCME - Mechanical FinalĀ | Re-inspection required | 2-25-25, have hvac tech be on site to provide roof access. 3/21/25: condensate drain must be coated for UV protection, properly secure liquid tight at all units, label all disconnect boxes, properly identify heater kit installed in units if used if none are used then units are all being over amped. Smoke detectors not installed on duct work, sun shield required on flex duct. |