Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Excavation/Rebar/Zoning
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Partial pass. Total of 11 footings. Reinforcements, size and depths per plans. Okay for concrete placement. Pending F2 footing on plan. 4/3/2025 | |
| 11/05/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | C4/F2 footer. West end at door entry. Length of 4’6” has been reduced to half the size due to concrete in place on the exterior side of wall (west) required documentation from engineering for approval. Okay to proceed at own risk. Interior shear wall footer per WF1. Roughly 48’ from East wall to center. Revised set of plans have been submitted for the other half heading towards the west wall. Cannot inspect per the first set of approved plans due to not meeting the detailed schedule. Ensure tape is in place at all verts prior to wire ties. 11/5/2025 |
|
| 11/12/2025 | COT - HCBU - Excavation/Rebar/Zoning | Partial Pass | Interior shear footing per WFI has been completed per detail. Reinforcements per plan. All verts have been taped. Okay for concrete placement in. 11/12/2025 |